Live

Loop

active
Build locksnone

Active builds

MTC-301EPIC: Crucible rebuild — render app + COS loop (the last rebuild)MTCIn Progress98V-143equip sync: sales_order_lines.quantity_shipped is wrong (= ordered qty even for Pending Fulfillment) — pull true fulfilled qty98VIn Progress98V-138equip-dash bug: Availability tab shows no data — inventory_snapshots is populated & fresh98VBacklog98V-75[Phase 4] Purchasing surface — projected demand × lead time vs on-hand + open POs98VBacklog98V-135netsuite-fanout-ust: add line-level deletion reconciliation (stale GL lines orphan in 98h-ust)98VIn ReviewMTC-293EPIC: Foundry control plane — productize the dashboard (see everything + set the dials)MTCIn Progress98V-134Migrate 98h-command financials to entity_pl_summaries (+ whole-day close-lag fix)98VIn ReviewMTC-344Control plane fix 1a: mirror the dials to Supabase (so the trigger can read them)MTCIn Review98V-128Planning 4e/8: driver/assumption write path (edits update the plan)98VBacklog98V-121Planning 4.5/8: build the Plan Grid screen (hero UI) from the design handoff98VBacklog98V-109Planning 8/8: conversational + API/MCP + scenario compare98VBacklog98V-106Planning 5/8: version types — Budget (lock) / Rolling CY / Rolling 1+1298VBacklogMTC-339Foundry orchestrator: dispatch cmd cross-wires ticket↔repo via .first() — re-pokes wrong/Done ticketsMTCBacklogMTC-346Control plane fix 1b: Foundry Loop reads the dials + passes priority_cutoff to the orchestratorMTCBacklog98V-105Planning 4/8: driver + account build-up layer (incl. personnel from Bamboo)98VBacklogMTC-300Foundry: backend/ETL tickets need a post-build smoke-run gate (runtime-broken PRs pass reviewer + CI)MTCBacklogMTC-321Crucible P2.9: live-progress — stream COS session log to the app (Realtime)MTCBacklog98V-74[Phase 4] Side-source: lead-time + vendor-item mapping seed98VBacklog98V-107Planning 6/8: three-statement output (IS / BS / CF) + 13-week cash98VBacklog98V-108Planning 7/8: intercompany management-fee allocation (build last)98VBacklog98V-96UST P&L 4/4 (future): extend entity_pl_summaries to equip + 98-holdings98VBacklog98V-4898H source gap: call_ahead / cdr / mobile_link_accuracy not captured upstream (ustapp)98VBacklogMTC-244Memory: compress RESOLVED memory files + fix stale gh-auth-switch guidanceMTCIn Progress98V-35SPOT-23: Compensation tab on employee deep-dive (HR-only)98VBacklog98V-34SPOT-22: HR admin — review-pipeline status board98VBacklog98V-4198H Command: Contractors tab — roster + route-level detail + exceptions98VDuplicateMTC-96Design + build agent feedback loop — runtime learning back to Smithy masterMTCBacklogMTC-100Offline-first architecture — full logging offline + sync queue + reconciliationMTCBacklogMTC-74Forge frontend rebuild via Claude design tool — V1 UI from designed specMTCBacklog

Open PRs

#103MTC-344: mirror control-plane dials to Supabase (fix 1a)offscriptholdings/foundry